Rainbow Procedures Manual

Document name

Rainbow Procedures Manual

Document type

Standard document

Version

3.0

Release date

November 25th, 2025

Status

Public consultation

Purpose of this document

This manual describes the rules and procedures for registering and operating Rainbow projects and issuing Rainbow Carbon Credits (RCCs). It should be used together with the latest versions of the Rainbow Standard Rules, Methodologies, and Double counting policy.

Language

In all Rainbow documentation, including the present Rainbow Standard Rules, Rainbow Procedures Manual, and Methodologies, the following terms are to be interpreted as:

  • Shall and must: a requirement

  • Should: a recommendation

  • May: an option, permissible

  • Is and will: in the context of Rainbow, standard operational procedures

Glossary

Last updated