This is a Carbon Storage Module and covers Marine sub-sediment burial. This module is part of the Rainbow BiCRS methodology, which allows Project Developers to choose the relevant modules for their project, and shall be used with the necessary accompanying modules.
See more details on how modules are organized in the BiCRS home page.
Eligible technologies
Project type
This module covers marine sub-sediment burial projects that inject waste and residual biomass feedstock inputs directly into the layer of . Projects shall meet all of the following criteria:
Demonstrate capability to perform MRV as agreed upon in the validated project documentation
Demonstrate a net-negative project carbon footprint based on initial LCA estimates of induced emissions and initial CDR estimates based on modeling
Projects that sink biomass to the seafloor but do not bury and embed it into marine sub-sediments are not eligible.
The entity eligible for receiving carbon finance is the operator performing storage at the sub-sediment burial site. Biomass producers and sub-sediment burial machinery manufacturers are not eligible Project Developers.
Project scope
A project is defined as all burial activities that take place from one port over the project lifetime (by default a maximum of 5 years, renewable), and all removal that occurs as a result of that burial, plus the upstream/downstream activities associated with that burial (e.g. GHG emissions from feedstock sourcing, transport...).
See the Storage batch section for more details on how a project is organized into different burial areas and burial events.
Eligible sites
Storage must be done in conditions.
Storage must be done in existing accessible . Projects that excavate, dredge or build wells for the sole purpose of accessing sub-sediments or creating sub-sediment conditions are not eligible, due to the associated environmental risks.
See the Site characterization section for more specific requirements.
Eligible feedstock
Only feedstock that also meets the requirements of the BiCRS Biomass Feedstock module is eligible in this module. Injection of liquefied or gaseous CO into sediments is outside the scope of this module.
See the BiCRS Biomass Feedstock module for more specific feedstock requirements.
Crediting timeline and process
Pre-project sampling
Before or in parallel to validation with Rainbow, the Project Developer shall obtain the necessary permits, and take measurements and samples, and gather secondary sources, for the Site Characterization Report and feedstock characterization, and propose a sampling plan.
Project validation
The Project Developer submits required documentation and undergoes an ex-ante validation audit. The project documentation is made available on the registry, expected CDR volume is estimated, and provisional credits are available for pre-purchase agreements. Specific prerequisites include:
Permissions have been granted to operate at the storage site, and to monitor the site up to 12-months after storage.
The storage points are technically appropriate and can allow for permanent carbon storage. This is proven by generating the Site Characterization Report, demonstrating adherence to all requirements in the Storage site requirements section.
The biomass feedstock has been secured and a preliminary assessment of organic carbon content has been made.
Expected CDR is modeled using validation-stage estimates equations.
Burial events
Feedstock mix is buried in the predefined storage points, and monitored at the storage site and storage batch level.
Visual proof of each burial event and site closure is required, via imagery documented in the PDD and subsequent Monitoring Reports, to confirm that the site is well-sealed by surrounding sediments or other surface enhancements (e.g. rocks/rubble, clay caps) and confirm closure.
(Optional) Monitoring: first measurement and CDR verification
Between 1-3 months after burial, Project Developers conduct first monitoring by following the Monitoring Plan and the Sampling Plan to measure organic carbon content in buried biomass for each storage batch. Additional storage points may be added within the validated storage sites. CDR estimates and permanence are updated with verified real data.
Project Developers may choose to either use:
50/50 issuance: undergo a verification audit by a VVB at the first measurement step and issue the first 50% of removal RCCs on the Rainbow registry. Repeat the audit after the following step (Step 5) to issue the remaining 50%, or
One-time issuance: skip the first measurement and verification step, and wait to issue 100% of removal RCCs at the second measurement stage described below (Step 5).
Monitoring: second measurement and CDR verification
Project Developers conduct the second monitoring at least 12 months after burial, following the Monitoring Plan and the Sampling Plan, to measure organic carbon content in buried biomass for each storage batch. CDR estimates and permanence are updated with verified real data, and verified by the VVB.
50/50 issuance: the remaining credits are issued. Any discrepancies in earlier results, for example as a result of degradation, shall be accounted for by updating CDR calculations and following the over/under crediting mechanism in the Rainbow Procedures Manual.
One-time issuance: all credits are issued for that storage batch based on the 12-month measurements.
Renew the crediting period
The Project Developer may choose to renew the project's crediting period to extend the monitoring plan and continue repeating steps 3 through 5.
Storage batches
Measurements and reporting are performed for storage batches. Verification and credit issuance is done at the reporting period scale (by default, annually), and groups results for all storage batches concerned during that reporting period. The organization of a project into storage batches, sites and points is described below, and depicted in Figure 1.
A storage batch is all burial events of homogenous feedstock mixtures at one storage site over a maximum of 31 days.
A storage site is a group of similar storage points within 24 km of one another with similar site characteristics.
A storage point is the precise spot where a burial event occurs. Similar storage points may be grouped into a storage site.

Sedimentary conditions for storage points within one storage site must be within the following ranges (data requirements are outlined in the Data Sources section):
Grain size: the majority grain size at the burial sediment depth must be either defined as either clay (0.002-0.05 mm) or sand (0.05-2 mm) for all storage points within a storage site, indicated by >50% of sediment grain size. Defined by recommendations of .
Water depth at storage point: At water depths 1-20 m, water depths must be within 0.5 m. At water depths 20-200 m, water depths must be within 5 m.
Sub-sediment depth of storage: At sub-sediment depths 2-3 m, storage depths must be within 0.5 m. At sub-sediment depths >3 m, storage depths must be within 1 m.
Ongoing burial into the sub-sediment shall last no longer than , to standardize sampling timescales. If burial continues after 31 days, it shall be considered a separate storage batch.
One project may work with different storage batches simultaneously. Each storage batch shall be monitored and reported separately within the same Monitoring Report. Storage batch information shall be monitored and reported at least once per calendar year.
Information about storage batches may be monitored and issued credits continuously by Project Developers by uploading claim information to the Rainbow MRV platform.
Feedstock mixture
A feedstock mixture is defined as one biomass feedstock or uniform mixtures of feedstocks. One feedstock mixture may be used across several storage batches, but any time the feedstock mixture of one storage batch changes, a new storage batch shall be started.
Any water used in the feedstock mixture must come from within the 24 km storage batch area.
The feedstock mixture composition may vary by no more than 20% to be considered the same homogeneous feedstock mixture, where the composition is made of feedstocks of a specific type from a specific supplier.
See the Pre-burial sampling section for requirements on feedstock sampling.
Storage site and storage point requirements
Storage points must meet the criteria outlined in Table 1 to be eligible. The criteria are set to ensure storage points are suitable for permanent carbon storage, are anoxic, and have low reversal risks.
All criteria shall be outlined in the Site Characterization Report, prepared before any burial events occur and submitted with the PDD for the validation audit. In addition, the Site Characterization Report shall provide GPS coordinates of each planned storage point, and a GIS-generated map showing each storage point and the delineation of the associated storage site.
Data sources characterizing storage points must be, in the following order of preference
primary data from a pilot survey e.g. site surveys, in situ measurements and measurements on samples collected at the project site, delivered by the Project Developer, or
secondary data from the specific area concerned (e.g. published peer-reviewed literature or database measurements) or
secondary data from an area that is proven to be sufficiently representative and similar to the project area in the appropriate factors that relate to permanent storage.
Table 1 The required measurements and information for a storage site that must be presented in the Site Characterization Report, before any burial occurs, to justify that the storage site is appropriate for permanent CDR via marine sub-sediment burial.
Marine water
Must be in coastal, sea or ocean waters with a salinity greater than zero. Freshwater burial is not currently eligible.
Anoxic Sediment Layer
Must reach deep enough into the sub-sediment to reach the . This shall be at least 2 m into the sediment (see Appendix C for justification), but actual depth to achieve this varies by site and shall be justified for each project.
The depth must remain anoxic year-round, accounting for bioturbation or increased advection/diffusion into sediments. The sub-sediment area must be stable with low likelihood of re-exposure, proven via established tools for determining sediment stability such as 210Pb or other geochronology tools.
Water depth
Must ensure the surface of the water bottom (seafloor or sediment surface) is not exposed to the air during tidal fluctuations.
Methane diffusion
Methane must not be diffusing out of the sediment-water interface. This is measured using as a proxy for methane diffusion. This requirement is to ensure that if any buried feedstock mixture degrades, it would not be emitted as the stronger GHG methane, and would instead be emitted as CO. In any case, loss of organic carbon from the biomass would be detected.
Potential gas exchange
Project Developers shall use all criteria mentioned above to calculate potential gas exchange from embedded depth into the atmosphere, to justify that there will be minimal gas exchange of any evolved gases with the atmosphere during a 1000 year period.
This requirement ensures that if any buried feedstock mixture degrades, the CO generated will likely remain trapped in the sediment and remain stored, rather than through the water column into the atmosphere.
Shelf slope
Sediment or seafloor gradation must be <1:100 to prevent sediment .
Sediment grain size
At the target sub-sediment depth, grain size must be at minimum 50% of at maximum 2 mm particle size.
Authorization and access
Project Developers must be authorized by jurisdictional authorities to operate, perform burial events and complete monitoring at the given geographic coordinates.
Potential for Future Disturbance
This shall be qualitatively and transparently discussed in the Site Characterization Report to determine if sediment disturbance may occur in the next 40 years, due to deep-sea mining, oil and gas extraction, trawling from fishing vessels, other resource exploitation, or any other use-conflict that might lead to reversal of storage. The site lease agreement should implement suitable barriers to such disturbance events.
Marine life
Characterize the biodiversity of marine life at the storage site, considering species type and abundance. This is used to 1) identify any sensitive biodiversity hotspots and 2) as a benchmark to compare identify any environmental damages after post-burial. Jurisdictional permitting and Environmental Impact Assessment procedures should already cover this, so this is implemented as an abundance of caution.
Sampling requirements
Sampling occurs at two stages of the project: sampling of the feedstock mixture before burial to establish organic carbon buried, and sampling the feedstock mixture after burial to check for any reversals (i.e. carbon degradation or diffusion. At both stages of sampling, laboratory testing shall provide the following measurements of the feedstock mixture:
% organic carbon content of the solid biomass
% moisture content of the feedstock mixture
density of the feedstock mixture
Pre-burial sampling
Two representative samples of the feedstock mixture shall be prepared and sent for laboratory testing per storage batch: one at the beginning (day one) and one at the end of the storage batch (day 31 or an earlier date when the storage batch is complete).
Post-burial monitoring and sampling
Post-burial monitoring and sampling shall occur:
at least 12 months after the burial event, and
optionally, may also be performed within 1-3 months after the burial event if the Project Developer chooses the 50/50 credit issuance approach. See the Crediting timeline and process section for more details.
Post-burial monitoring and sampling should be completed using sediment coring, to access the buried biomass, extract samples, and send them to a laboratory to measure the organic content of the solid biomass. Alternative approaches may be considered on a case by case basis, and approved by the VVB, the Rainbow Certification team and, if deemed necessary by the Rainbow Certification team, an expert peer reviewer.
Sampling and laboratory testing shall be done separately for each storage point. At least three sub-samples shall be taken from each storage point and mixed together to obtain one composite sample for the storage point. Samples can not be mixed from all storage points in one storage site to perform laboratory tests on a composite sample.
Sampling plan
Project Developers shall prepare an ex-ante Sampling Plan before any burial events occur, and submit it with the PDD for the validation audit. The Sampling Plan shall describe:
how representative samples will be taken of the feedstock mixture in pre-burial sampling
how to preserve moisture content of feedstock mixture while sending it to the lab
number of samples used for post-burial sampling
strategy for ensuring random/representative/unbiased sampling locations for post-burial sampling
Sampling procedure
The Sampling Plan described above is developed ex-ante during validation and outlines the intended sampling approach. During monitoring and ex-post verification, Project Developers must provide a Sampling Procedure, described in the Monitoring Report, which documents the actual sampling approach that was implemented.
Ideally, the Sampling Procedure should align exactly with the Sampling Plan. However, given real-world challenges that may arise during monitoring, deviations are expected. The purpose of documenting the Sampling Procedure ex-post is to ensure transparency by capturing any adjustments made to the original plan.
The Sampling Procedure shall include all elements listed in the Sampling Plan components section.
Eligibility criteria
The eligibility criteria requirements specific to this module are detailed in the sections below. Other eligibility criteria requirements shall be taken from the accompanying modules and methodologies:
Permanence
Removal Rainbow Carbon Credits (RCCs) issued from marine sub-sediment burial have a permanence horizon of 1000 years.
Permanence is assessed at two points during project certification:
at ex-ante validation it is estimated using literature data and models
during verification it is demonstrated using direct measurements.
Requirements for each stage are detailed below.
Estimating permanence at validation
To demonstrate that carbon in sub-sediment burial will remain permanently stable, indicators from the Storage site and storage point requirements section must be provided at validation, in the Site Characterization Report, demonstrating compliance with the requirements.
These indicators are suitable proof that a substantial fraction of the buried carbon is permanently stable. The amount of permanently stored carbon is determined using the models and equations detailed in the GHG reduction quantification section.
Demonstrating permanence at verification
At verification, it is assumed that 92% of organic carbon still remaining in the feedstock mixture 12 months after burial will remain permanently stored over 1000 years. This is based on modeled results for oxic marine sediments, and likely overestimate the non-permanent fraction of organic carbon in anoxic marine sediments, as required under this module.
For each storage batch, the organic carbon content in the buried feedstock mixture is measured via sampling, and observed via remote sensing, at 1-3 months (optional) and 12 months (mandatory) to determine the carbon permanently stored.
The actual amount of permanently stored carbon is measured as described in the GHG quantification section, replacing the modeled amounts used during validation to issue ex-post Rainbow Carbon Credits.
If measured organic carbon loss, at 3 or 12 months, exceeds 2% of the initially buried carbon, degradation may be triggered. In this case, the project is considered compromised, and carbon credit issuance for the affected storage batches will be paused. The Rainbow Certification team will collaborate with Project Developers to determine the cause of the unexpected loss and decide on appropriate corrective actions, including canceling issued credits according to the Rainbow Procedures Manual.
Risk of reversal
Project Developers shall fill in the Rainbow Marine sub-sediment burial risk evaluation to evaluate the risk of carbon storage reversal, based on social, economic, natural, and delivery risks.
Project Developers shall assign a likelihood and severity score to each risk, and provide an explanation of their choices. The Riverse Certification team shall evaluate the assessment and may recommend changes to the assigned scores.
The Project Developer, Riverse Certification team, or the third-party auditor may suggest additional risks to be considered for a specific project.
Each reversal risk with a high or very risk score is subject to:
risk mitigation plan, developed by the Project Developer, that details the long-term strategies and investments for preventing, monitoring, reporting and compensating carbon removal reversal, or
additional contributions to the buffer pool, at a rate of 3% of verified removal Riverse Carbon Credits for each high or very high risk
All projects under this module are estimated to have a material reversal risk, due to
risk of degradation from improper burial in oxic conditions
risk of physical leakage from burial sites
the novelty of the technology, meaning the abovementioned points have not been proven as consistent and reliable.
Therefore, the risk mitigation plan includes adhering to all site characteristics, plus a reversal monitoring requirement. At least 5 years after burial, Project Developers shall
at a subset of storage sites, measure remaining organic carbon in feedstock samples
at all storage sites, confirm the presence and extent of buried feedstock using radar
Co-benefits
Project Developers shall prove that their project provides at least 2 co-benefits from the UN Sustainable Development Goals (SDGs) framework (and no more than 4).
Common co-benefits of Marine sub-sediment burial projects, and their sources of proof, are detailed in Table 2. Project Developers may suggest and prove other co-benefits not mentioned here.
Table 2 Summary of common co-benefits provided by Marine sub-sediment burial projects. Co-benefits are organized under the United Nation Sustainable Development Goals (UN SDGs) framework.
SDG 9: Industry,
innovation, and
infrastructure
The use of offshore technology, such as oil and gas exploration and exploitation equipment, retrofitting maritime vessels to use for more sustainable application than fossil fuel extraction and merchant transport.
Project Developers standard operating procedure (SOP) for the disposal and burial of biomass feedstock.
SDG 14: Aquatic life
Project Developers can develop long-term ecological monitoring stations to support monitoring of sub-sediment burial and support regional monitoring for ocean health indicators.
Project Developers demonstrate collaborations with regional universities or governmental institutions for collaborative long-term monitoring, and measurements to be completed. Relevant data should be open source.
Environmental and social do no harm
Project Developers shall prove that the project does not contribute to substantial environmental and social harms.
Projects must follow all national, local, and European (if located in Europe) environmental regulations related to the project activities.
Feedstock sustainability risks shall be taken from the Biomass feedstock module.
ESDNH risk evaluation
Project Developers shall fill in the Rainbow Marine sub-sediment burial risk evaluation to evaluate the identified environmental and social risks of Marine sub-sediment burial projects. The identified risks include:
Release of biomass via improper embedding
Release of aqueous CO or methane at sediment-water interface
Release of hydrogen sulfide at oxic-anoxic transition zone
Project activities impacting benthic life
Transfer of harmful pollutants in biomass feedstock
Marine pollution due to ship time spent over storage site
Project Developers shall assign a likelihood and severity score of each risk, and provide an explanation of their choices. The VVB and Rainbow’s Certification team shall evaluate the assessment and may recommend changes to the assigned scores.
All risks with a high or very high risk score are subject to a Risk Mitigation Plan, which outlines how Project Developers will mitigate, monitor, report, and if necessary, compensate for any environmental and/or social harms.
Additional proof may be required for certain high risk environmental and social problems.
The Project Developer, the Rainbow Certification Team, or the VVB may suggest additional risks to be considered for a specific project.
Permitting
Project Developers must follow all relevant laws and legal requirements for reporting operations to local, federal and international governing bodies. Project Developers must follow the requirements outlined in their permit relating to the amount of tonnes injected if specified, and geographic area permitted for operations.
Permits are typically required for accessing coastal marine sediments and performing sub-sediment burial. The Project Developer must provide written authorization by either 1) the permit granting regulatory authority or 2) by the partner providing the permit demonstrating freedom to operate and perform sub-sediment burial in the geographic area defined in the PDD.
Environmental Impacts Assessment (EIA)
Typically, the EIA should be completed in advance of obtaining permitting for credit generation, and will be completed over the course of operations and reported to Rainbow.
EIA may not be required for all permits for storage. When EIA is not required for permitting (e.g. for a research permit or permit exemption), the Project Developer shall demonstrate that a baseline environmental survey has been completed, assessing the elements listed below, and that the potential impacts have been considered to be within regulatory guidelines. This justification shall be evaluated by both the VVB and the Rainbow Certification Team. Project Developers shall provide the same information as they would in a full EIA to Rainbow for project validation, and cover aspects including:
Marine protected areas
Benthic habitat
Fishing grounds
Shipping lanes
Subsea infrastructure
Materials of historical significance
Baseline environmental survey and/or EIA must address how the project adheres to regulatory requirements such as limitations on sediment resuspension and habitat destruction due to seabed intervention.
GHG quantification

The system boundary of this quantification section starts after burial of feedstock mixture and covers carbon storage through end of life after 1000 years, and accounts for potential re-emission and decay modeled for 1000+ years. Sources of GHG emissions covered in this module include only permanent carbon storage modeling. Other GHG emissions shall be taken from the accompanying modules.
Data sources
The required primary data for GHG reduction calculations from projects are presented in Table 3. These data shall be included in the project’s PDD and made publicly available.
Table 3 Summary of primary data needed from projects and their source for project validation and verification. See the Monitoring Plan section for more details on monitoring and verification requirements. Asterisks (*) indicate which data shall be updated for each storage batch.
Sediment grain size
mm
primary data from a pilot survey of the site
secondary data from the specific area concerned (e.g. published peer-reviewed literature or database measurements)
secondary data from an area that is proven to be sufficiently representative and similar to the project area in the appropriate factors that relate to permanent storage
reported in the Site Characterization Report
Sub-sediment depth (X)
m
Same as above
Volume of feedstock mixture buried per storage batch*
m
Equipment logs on machinery delivering the burial
Organic carbon content of feedstock mixture *
% organic carbon
Laboratory testing of feedstock mixture samples
Measured per storage batch, 2x pre-burial and 1-2x post-burial (1-3 months, and 12 months)
Reported in the Feedstock Characterization Report for each storage batch
Moisture content of feedstock mixture*
fraction
Same as above
Density of feedstock mixture*
kg/m
Same as above
Secondary data taken from the literature are used to define default values for the parameters outlined in Table 4. These values are only used for ex-ante validation models, and will be replaced by project measurements during verification.
If project incubation experiments or in situ experiments are used to provide values for and parameters, these experiments must either 1) be scientifically peer reviewed and published in academic journals, or 2) undergo independent external peer review for the specific project.
Table 4 Values from scientific literature that may be used instead of primary data, for validation stage ex-ante carbon degradation modeling.
Fractional pools of complex organic carbon
and
Project Developers may choose between three sources for these values:
(oxic biomass bale sinking experiment, values are 0.012, 0.091, 0.897 for each variable, respectively).
project incubation experiments with the feedstock mixture in representative marine sub-sediments.
in situ experiments with the biomass feedstock mixture in representative marine sediments.
Rate constants
and
Same options as above.
values are 0.04, 0.002, and 0 for each variable, respectively
Carbon storage modeling
Carbon storage is calculated by subtracting the amount of organic carbon degraded over 1000 years from the amount of initially buried organic carbon.
Carbon burial is measured using the amount of feedstock mixture buried, and its measured organic carbon content.
Carbon degradation is subtracted from this carbon burial. It is modeled at validation and measured at verification.
Carbon degradation
The greatest risk to carbon removal reversal is degradation of buried feedstock mixture by microbes in the sub-sediment. This is limited by the site requirements that ensure anoxic conditions preventing degradation in the first place, and by sediment conditions ensuring that if degradation occurs, any evolved CO would stay trapped in the sub-sediment. Nevertheless, the calculations conservatively assume that any CO degraded is diffused out of the sub-sediment.
Carbon degradation is conservatively modeled during validation using a (see Appendix A and Example 1), and measured during verification.
If monitoring measurements at 1-3 months or at 12-months show that >1% of buried organic carbon has been degraded and/or diffused, then the conservative models used at validation shall be applied to issue RCCs. See Eq. 4.
Empirical peer-reviewed research has only covered rate constants for organic matter degradation () for use in the under marine sediment oxic conditions, but the projects covered under this methodology occur in marine sub-sediment anoxic conditions.
In absence of resources covering anoxic conditions, a literature review is described in Appendix A using decades of research on analogous environments and describing the expected range of in anoxic environments.
Nevertheless, oxic-environment rate constants are applied in ex-ante modeling here, which is a conservative approach because this is expected to overestimate potential degradation in the sub-sediment burial anoxic conditions. This methodology may be revised to account for new measurements of anoxic-condition rate constants.
Example 1: GHG quantification validation modeling
This example demonstrates the validation-stage, ex-ante carbon storage modeling for the burial of 1 tonne of COeq (=1) at a sediment depth () of 5 m, using literature values from described in Table 4.
The literature values used here are intended to conservatively overestimate carbon loss, because they are taken from experiments under oxic conditions where degradation is more likely than in the anoxic conditions required under this methodology.
Using equations 1-8 we obtain the the following results for , also shown in Figures 3a and 3b below for 1 and 1000 years, respectively.
= 1 t COeq
= 0.999 t COeq
= 0.9993 t COeq
= 0.9093 t COeq
In this case the estimated permanent carbon removal, over 1000 years, is 0.9093 tCOeq. Induced emissions from other modules would be calculated and subtracted from this removal estimate to determine the number of provisional credits to make available.
If, for example, upon monitoring, the Project Developer takes samples of the buried feedstock mixture and measured a = 0.9995 t COeq. This represents an of 0.05%, below the 1% threshold, so the project may issue RCCs based on the actual measured value of 0.9995 t COeq (adjusted by the induced emissions calculated in other modules).
If, for example, the Project Developer measures a = 0.985 t COeq. This represents an of 1.5%, above the 1% threshold. The measurements are not used, it is considered that degradation has been triggered, and the project will issue credits based on their validation-stage estimates (i.e. 0.9093 t COeq.).


Assumptions
The entirety of buried biomass will be securely located in the seabed, allowing point-source monitoring of organic carbon degradation via measurement of organic carbon content.
Organic carbon degradation is . 12 months is an appropriate and sufficiently long timeframe to determine how much carbon degradation (if any) will occur over 1000 years.
Biomass degradation will either begin after embedding in the sub-sediment following a logarithmic relationship (), or it will not occur at all.
The rate of organic carbon degradation under oxic conditions is greater than the rate under anoxic conditions.
Biomass degradation can be measured by tracking organic carbon content of samples of the buried feedstock mixture over time.
Storage points will not experience re-suspension or re-working such that burial biomass is exposed to the water column over 1000 years.
The site characteristics and requirements detailed in Table 1 are suitable to identify sub-sediment areas that are anoxic.
Any organic carbon degradation from the buried biomass leads to CO released to the water column, and eventually back to the atmosphere, via diffusive transport (see Eq. 4, = 1). This is a conservative assumption, because degraded carbon may remain trapped permanently in the sediment matrix as CO. Indeed, the site requirements are set to ensure that CO diffusion out of the sediment matrix is minimized.
Methane diffusion can be measured using oxygen penetration depth as a proxy. If O is measurable in the surface layer of marine sediments, methane is unable to diffuse out of the sediment-water interface.
Uncertainty assessment
See general instructions for uncertainty assessment in the Rainbow Standard Rules. The outcome of the assessment shall be used to determine the percent of RCCs to eliminate with the .
The uncertainty in this module is assessed below for each component.
The baseline scenario selection has low uncertainty: it is certain that the share of project technology occurring in a Business as Usual scenario is very low.
The uncertainty at the module level is estimated to be low. This translates to an expected discount factor of at least 3% for projects under this module.
Risk evaluation template
👉 Download the template here
Monitoring plan
The following information shall be provided for verification of each storage batch:
Volume of feedstock mixture buried per storage batch
To calculate
Each burial event
Organic carbon content of feedstock mixture
To calculate
Each storage batch: Day 1 and last day of burial, and 12 months post-burial (optional 1-3 months post-burial for 50/50 credit issuance)
Moisture content of feedstock mixture
To calculate
Each storage batch, 2x pre-burial Each storage batch: Day 1 and last day of burial, and 12 months post-burial (optional 1-3 months post-burial for 50/50 credit issuance)
Density of feedstock mixture
To calculate
Each storage batch, 2x pre-burial Each storage batch: Day 1 and last day of burial, and 12 months post-burial (optional 1-3 months post-burial
Visual proof of burial (e.g. photos or video taken during the burial event)
To confirm that the storage site is closed.
Each burial event
Appendix
Appendix A: Scientific Basis of Sub-Sediment Biomass Storage
This appendix outlines the scientific foundation for sub-sediment biomass storage, summarizing key research on organic carbon degradation and preservation in marine sediments. While no studies directly replicate the conditions described in this module, relevant literature on similar processes is compiled.
Introduction
Marine sediments serve as the final carbon sink, storing 150–200 billion tons of organic carbon in their upper layers (Hedges & Keil, 1995; Hedges, Keil & Benner, 1997; Atwood et al., 2020). The biological pump transfers oceanic carbon to sediments via microbial fixation, food chain dynamics, and sinking particulate matter. Despite its inefficiency—only ~1% of sinking carbon reaches sediments, and just 0.1% is buried long-term (Burdige, 2007; LaRowe et al., 2012)—this process significantly influences atmospheric CO₂ levels.
Biomass degrades rapidly in oxygenated sediments, but in anoxic environments, it can persist for millennia. Oxygen exposure time (OET) controls degradation: prolonged exposure breaks macromolecules into labile forms, accelerating conversion to CO₂. Reducing OET preserves biomass, as seen in bog bodies and historic wooden structures preserved in compacted, oxygen-deprived sediments (Ceccato et al., 2014; Macchioni et al., 2016).
Organic Carbon Preservation in Marine Sediments
Decades of research (Hedges & Keil, 1995; Arndt et al., 2013; LaRowe et al., 2020) indicate that organic carbon degrades slowly in anoxic sediments due to low substrate availability, microbial competition, mineral protection, and biochemical inaccessibility (Kristensen & Holmer, 2001; LaRowe et al., 2022).
Biomass preservation for over 1,000 years is common in coastal zones with high sedimentation rates and low OET. For example, rapid burial in the Bay of Bengal (30 cm/yr sedimentation) protects wood from microbial degradation, preserving organic material for millions of years (Lee et al., 2019). Similarly, wood fragments up to 11,900 years old have been recovered from the Gulf of Mexico (Schwab et al., 1996), and entire ancient forests remain buried off the Alabama coast (Delong et al., 2021; Moran et al., 2024).
Studies show organic carbon degradation slows exponentially over time, with rates up to 1,000× lower in anoxic sediments than in oxic environments (Kristensen & Holmer, 2001; Keil et al., 2010; LaRowe et al., 2012; Arndt et al., 2013). This supports the assumption that degradation rates in oxic conditions (Keil et al., 2010) represent a worst-case scenario for anoxic sub-sediment burial.
Biomass Degradation in Marine Sediments
Biomass degradation begins with extracellular enzymatic hydrolysis, where aerobic microbes break down macromolecules into small organic compounds. These are further processed via anaerobic fermentation into substrates for redox reactions. However, without sufficient OET, enzymatic hydrolysis cannot begin, preventing degradation (Hartnett et al., 1998; Hedges et al., 1999). Ligno-cellulosic biomass requires longer OET than algal biomass to initiate breakdown.
In deep sediments, sulfate reduction is the dominant degradation process, accounting for 50% of total biomass decomposition globally (Jorgensen et al., 2019). This slow, energy-limited process produces CO₂ and hydrogen sulfide (HS). CO₂ diffuses upward, where it may be fixed by microbes or released at the sediment-water interface. Worst-case CO₂ diffusion rates align with modern dissolved inorganic carbon (DIC) fluxes (Krumins et al., 2013). CO₂ accumulates due to compaction, it can form hydrates at depths >10 m in cold marine sediments (Eccles & Pratson, 2012; Velaga et al., 2011).
Hydrogen sulfide, though toxic, is rapidly oxidized in oxygenated environments, preventing marine toxicity. Additionally, 10–20% of HS reacts with iron hydrates to form pyrite (FeS), further stabilizing organic matter (Barber et al., 2017; Baumgartner et al., 2023).
Methanogenesis, consuming 15% of CO₂ from sulfate oxidation, contributes to organic carbon degradation (Regnier et al., 2011). Over time, sediment compaction reduces porosity, slowing diffusion and promoting FeS formation. This further limits CO₂ and methane movement, allowing microbial utilization.
Conclusion
Long-term biomass preservation in marine sediments is driven by low OET, rapid burial, and anoxic conditions. Anoxic degradation is significantly slower than oxic processes, enhancing the stability of buried carbon. Existing research supports the feasibility of sub-sediment biomass storage as a durable carbon sequestration strategy.
Appendix B Additional optional ESDNH indicators to monitor
ESDNH indicators may be measured by the Project Developer within the validation stage to reduce project risk, and suggested monitoring during the verification stage.
To monitor environmental risk, Project Developers should understand the biogeochemical zonation of sediment depths where biomass is stored. In anoxic marine sediments, organic molecules degrade via sulfate reduction, producing hydrogen sulfide (HS), which diffuses upward and oxidizes to sulfate in oxygen-rich layers. In the absence of sulfate, methanogenesis dominates, producing methane (CH). Both processes can generate HS or CH, posing environmental risks.
Hydrogen sulfide is toxic to benthic life, and excessive production may exceed oxidation rates, increasing ecological risk.
Methane, a potent greenhouse gas, can also impact benthic organisms if released.
To mitigate risks, HS and CHemissions at the sediment-water interface should remain below environmental thresholds. Project Developers are encouraged to measure dissolved sulfate, HS, and CHconcentrations in target sediment layers before burial and include these gases in their monitoring plans to ensure environmental safety.
Suggested monitoring plan additions to monitor environmental harms
Dissolved hydrogen sulfide (HS) in storage batch sediment porewaters at 1- and 12-month intervals
To detect microbial activity that might indicate increased environmental risk, even without %OC changes
Each storage batch, 12 months after burial
Dissolved sulfate in the sediment porewaters
To determine that the depth of storage has > 1 Mm of sulfate for organic carbon degradation to proceed using sulfate as an electron acceptor
Each storage batch, 12 months after burial
Methane (if dissolved sulfate is not measurable)
To assess methane production, which would indicate the use of methanogenesis rather than sulfate reduction
Each storage batch, 12 months after burial, if dissolved sulfate is not measurable
Appendix C Reasoning for 2 m burial depth
In addition to reaching below the maximum oxygen penetration depth at any season, there is a required sub-sediment depth of at least 2 m depth into the sediment is required due to risk of reversal, due to maximum 2m sediment scouring during tropical zones, and infilling of previously scoured areas due to resuspension due to storms (Morton, 1979; Sherwood et al., 1994), fluid-mud flows (Wheatcroft, 2000), and erosion (Morton, 1979, Harris & Wiberg, 2001).
On the continental shelf, seafloor sediments are eroded and reworked by bottom currents and wave action, a process known as “scouring” (Flood et al. 1983). This creates linear or lobate depressions shaped by dominant environmental forces. Channel-shaped scours, or furrows, range from 10–100 meters wide and 100–1000 meters long, with coarse sand or gravel floors. Larger lobate deposits (100–500 meters wide) are often filled with mega-rippled coarse sand, forming "Rippled Scour Depressions" (Davis et al. 2013). Major storms can also transport large amounts of sediment to the deep sea without leaving scours (Teague et al. 2006).
Scouring and sediment resuspension pose risks to carbon storage in shelf sediments, as buried biomass must remain covered to prevent oxygen exposure. To assess this risk, we reviewed 29 studies on sediment furrows and ripple scour depressions across various depths and oceanographic settings (Figure 4, Table 5). Reported scour depths, including those from extreme events (e.g., Hurricanes Katrina, Ivan, Sandy), inform our recommendation of a >2-meter burial depth for carbon storage. While regional variation is significant, findings from Ferinni et al (2005) suggest that wider continental shelves may offer greater protection from erosion.

Table 5: Summary of observation of furrowing and rippled scour depressions in literature
Location
Water Depth
Scour Depth (cm)
Width (m)
Reference
Version history
This page describes the changes in the Marine sub-sediment burial module.
Module created
--
February 2025
V1.0
Last updated